Ningbo Haijiang Machinery Co.,Ltd. sales@china-haijiang.com 86-574-88233242
Product Details
Place of Origin: China
Brand Name: Taihong
Certification: ISO9001
Model Number: bottle cap moulds
Payment & Shipping Terms
Minimum Order Quantity: 1
Price: negotiable
Packaging Details: Export standard
Delivery Time: 45days
Payment Terms: T/T
Supply Ability: 20sets/month
Mould Material: |
NAK20,S136,P20.718H,738H,45#,etc |
Mould Base: |
LKM;HASCO;DME,etc |
Runner: |
Hot/cold Runner |
Cavity: |
8 Cavities |
Mould Material: |
NAK20,S136,P20.718H,738H,45#,etc |
Mould Base: |
LKM;HASCO;DME,etc |
Runner: |
Hot/cold Runner |
Cavity: |
8 Cavities |
High-Precision PET Water Drink Mould Manufacturing
Business Steps
1. R& D We support customers' R& D. We'll make the files or improve the design if you need
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get.
3. Negotiation The negotiation includes quality, price, material, delivery time, payment item, ect.
4. Mould Design We need to spend 3-5 days on mould and product 3D/2D drawing design
5. Mould We will build the mould based on customers' requirements. Before making the mould, we'll send mould design to get customers' approval first. Mould will be usually completed in 25-60 days
6. Mould Testing When moulds are finished, we will test the moulds to check if they will satisfy consumers' needs. And we will send samples for consumers' reference.
7. Sample shoot If the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.
8. Delivery We'll delivery goods either by sea or by air, according to customers' requirements.
Mould Information:
Mold information | content |
Product Material | ABS,PP,PC,PA,PMMA,PS,POM and etc. |
Moldbase | FUTABA,LKM,HASCO,DME you can choose |
Cavity material | 45#,50#,P20,H13, 718 2738, NAK80, S136, SKD61 etc |
Runner | Cold/Hot runner |
Cavity | Multi or single cavity |
Standart parts | Hasco |
Gate type | Side gate,Sub gate,Pin point gate,Edge gate etc |
Treatment | Heat treatment and Nitriding,polish ect. |
HRC | H45~52 |
Product weight | 50~5000K |
Machine type | 250Ton |
The standard of appearance of the products for stripe | MT(Mold Tech),YS,HN series |
The way of Color contrast | RAL K7,PANTONE |
Plastic Mold (Moulds) production process | Description |
1. 3d Design/Samples for quotation | According to 3D drawing or samples for quotation. |
2 .Negotiations | Including the price of moulds, moulds sizes, material for cores & cavities, weight of product, part cost, payment, moulds lifetime, delivery, etc. |
3. Purchasing Order | After the customer confirming the mould design and quotation. |
4. Making mold(moulds) | Confirm drawing, start to do DFM,mold flows and mold detail agreed with the customer, start production. |
5. Production schedule | Every week we will feedback to the customer a mold progress(picture). |
6. sample shoot | We provide the moulds test samples for confirmation(about 10-15 piece), then, get your signature sample ,mass production. |
7. Package | Wooden case for moulds, cartons for parts ,or as your requiretment. |
8. Delivery | deliver goods by air or by sea. |